The MTAA is accepting design/build bids for the construction of a new maintenance shop at Philip Billard airport (3600 NE Sardou Ave, Topeka, KS) The building will be an 8000 sq. ft. single slope structure with 3 garage doors. Two of the doors should be 20'W X 14'H, and the other door should be 12'W X 14'H. It is expected that the contractor obtain all required permits for the build. All utilities must be stubbed into the building, which includes water, sewer, gas and electricity with 400 amp single phase wiring. Other requests to the build include 8" thick concrete, R30 roofing material and R19 wall insulation. 

Please see draft floorplan here.

Please see bidding specifications here.

Please contact Maintenance Director Terry Poley at This email address is being protected from spambots. You need JavaScript enabled to view it. or 785-633-9957 for details on the work requested. If interested, please provide bids by Tuesday, February 3rd at 10:00 am CST to Laura Hartley at This email address is being protected from spambots. You need JavaScript enabled to view it..  

metropolitan topeka airport authority
topeka regional airport & business center
6510 SE Forbes Ave., ste. 1, topeka, ks 66619-1446
785.862.2362